Nexans – Project Osprey

Share This:

Construction of a turnkey wharf and loading platform to accommodate the Owner’s specialized cable laying vessels and cable loading operations. Work included bucket dredging approximately 165,000 CY to Elevation -35MLLW in the Cooper River. The installation of 24″ PSC piles, Construction of precast/Cast-in-Place Concrete Wharf, Installation of mooring & breasting dolphins, loading platform, fender system, placement of 21,000 tons of rip rap, installation of 100’L access bridge, and upland civil work. SJ Hamill worked with the engineer to implement a value engineering redesign to accommodate the Owner’s budget.