Cooper River Terminal Foundation Construction Project

Share This:

Vulcan Materials Company contracted SJ Hamill to construct pile supported foundations for their Cooper River Terminal’s new aggregate ship-to-shore conveyor system and truck scales. Work consisted of excavating, dewatering, shoring, driving piles, tying reinforcing and forming/placing concrete for 24 individual foundations ranging is size from 5CY to 140CY. The pile caps are supported on 5,918 LF of 14″ and 18″ Square PSC pile. SJ Hamill self performed over 98% of the contract work while coordinating with Vulcan to complete the project within an active marine terminal facility and expedited construction schedule.