Vulcan Materials Company contracted SJ Hamill to construct and repair existing and new moorings for their Cooper River Terminal’s new aggregate ship-to-shore conveyor system ship berthing. Work consisted of replacing two 100 ton bollards with new 150 ton bollards on their river dolphins and procuring and installing a new ship berthing buoy for the stone ships now offloading at the facility. SJ Hamill continues to be to contractor of choice for all work at Vulcan’s Cooper River Terminal.